
NOVA S25E6: Super Bridge
- Aired: 1997-11-12
- Time: 21:00:00
- Runtime: 60 minutes
Overview
Engineers solve a unique set of problems in safety, aesthetics, and cost as they build a bridge over the Mississippi River.
Engineers solve a unique set of problems in safety, aesthetics, and cost as they build a bridge over the Mississippi River.